Arnold – March 2019
Repainted the entry foyer, half bath, two story staircase and upper grand room in this Wildwood home.
Note: Area was still in the drying process on the Friday we completed the work.
Repaint of a downtown studio apartment in the Blu Spaces high rise condo. Repainted one coat ceilings except for a small area that had what appeared to be candle soot, one coat semi gloss white on trip and two coats of Promar 200 Zero VOC in low sheen eggshell in the main area, kitchen, closet and bathroom.
Before pictures
After pictures
Second trip back to this condo complex. First trip was some wallpaper removal work in their lobby. This trip was to deal with some badly peeling floors in their basement/garage area. This is before, during and after pictures. Although we always suggest doing everything the best method which in this case would have been to strip all existing paint off the concrete floors taking it back to bare concrete, etching, priming, painting then clear coating the customer opted for a repair scenario. We sanded all the floors, used a concrete primer over totally bare areas then primed the entire surface with a extreme bonding primer then doing two coats of one part epoxy over the top. All the photos of light grey were taken after priming and the darker grey was after the epoxy application. This was a one part premixed epoxy designed for garage floors which seemed perfect for a walking surface.
Repaint of this Fenton area home. We did all ceilings, walls, trim, doors and frames except for two bathrooms and the kitchen. These are all after pictures of the project and are not all photos of the job as some were lost after our phone dying losing all of December and some of the January photos.
Repainted foyer, LR, DR, Kitchen and Hallway – walls only.
Repainted this single family home in south city. Some minor drywall repairs were completed, sanded down some overtexture from prior repairs then painted ceilings and walls throughout as well as a single coat of grey to refresh the deck.
Took care of some small drywall repairs then repainted ceilings and walls (no trim).
Quick repaint of the waiting room area for Chesterfield Dentistry. Note the walls were still drying when the photos were taken.