Imperial – September 2016

Project: Imperial – September 2016

Title:

Description:

Imperial – September 2016

Project: Repaint two bedrooms with accent walls, one bathroom and the ceiling in a second bathroom.

What was painted: Ceilings, walls and woodwork in both bedrooms and one bath and just the ceiling and single wall in the larger bathroom. Doors were also removed and painted as well as the trim and door jams.

Colors used: n/a

img_0845 img_0843 img_0842 img_0835 img_0831 img_0830 img_0829 img_0824 img_0823 img_0820 img_0819 img_0818 img_0817 img_0816 img_0815 img_0814 img_0813 img_0812 img_0811 img_0840 img_0838 img_0837 img_0836

Verified by MonsterInsights