Current Project – Wildwood

Project: Current Project – Wildwood

Title:

Description:

Current Project – Wildwood

The customer called us after starting to take down the paper themselves and tore into the wall board pretty quick. At this point we have come in and steamed off all the paper and backing, gave the walls a nice washdown and patched the damaged spots with finish mud. We are letting this all dry over the weekend. We then did a nice sand over the entire wall and double check our patch spots to make sure they are nice and flat then seal everything. Following day two coats of paint and cleanup. We also painted a small hall wall which is not pictured.

Verified by MonsterInsights