Final job of 2021.. a simple same color repaint however we did switch from flat to a low gloss eg-shel level paint for durability. We painted the 11′ ceilings in the living rom/kitchen combo, the back hallwai, foyer, hallway, two secondary bedrooms and the master bedrooms walls and baseboards only.