Richmond Heights – September 2018

Project: Richmond Heights – September 2018

Title:

Description:

Richmond Heights – September 2018

Removed and patched in numerous electrical outlet boxes and filled in holes. One wall in the conference room also sustained pretty significant damage after the removal of large cabinets which was also repaired. Then repainted the entire office area with multiple accent walls and colors.

Verified by MonsterInsights