High Ridge – May 2017

Project: High Ridge – May 2017

Title:

Description:

High Ridge – May 2017

Job in progress. This home is being prepped for sale so the owner decided to go from the tan with a hint of peach hue to it back to a standard neutral tan on the entire first floor and hallway and a neutral tan in the bedrooms. Two ceilings also painted (kitchen and family room). We will be finishing this one after Memorial Day but these are the finished rooms so far.

After

 

Before Pics

Verified by MonsterInsights